TrueNorth
Material Order
Tile
Job
PO number
Order name
Job address
Distributor
Westlake
Eagle
Profile
Boral Mission S
Monier Villa W
Capistrano S
Malibu W
Package
Silver
Gold
Platinum
Job finish (colour)
Brown unless the customer asked for something else. Valley metal stays galvanised regardless.
Measurements
Total roof (SQ)
Steep (SQ)
Low slope (SQ)
Ridges (LF)
Hips (LF)
Valleys (LF)
Rakes (LF)
Eaves (LF)
Drip edge (LF)
Waste factor
0%
7%
10%
12%
14%
15% (default)
17%
22%
Applies to area lines only. Linear runs stay at a flat 1.15.
Counts from the roof
Pipes 1.5"
Pipes 2"
Pipes 3"
Pipes 4"
T-tops 4"
T-tops 7"
Vents
Dormer vents
Calculate order
Materials
Delivery
Method
Delivery
Pickup — Chandler #1298
Site
Remodel
New construction
Date
Time
AM
PM
Anytime
Drop
Roof load
Ground drop
Date TBD
Delivery address
Accessible sides
Obstructions
Placement notes
Contact
Email
Phone
0 lines
Draft
Save as Approved